Story Bridge closure bus changes will hit inner-city commuters from 1am on Sunday 27 December, when the bridge shuts to traffic for up to three weeks of resurfacing and waterproofing. If your bus usually hums across the river between Fortitude Valley and Kangaroo Point, it will be taking the long way round until 5am on Monday 18 January 2027.
Council’s transport chair, Cr Andrew Wines, told this week’s council meeting that every bus that normally uses the bridge will be sent through the inner south busway and over the Victoria Bridge instead. Council says five stops will close, with temporary and alternative stops set up nearby.
Closure dates at a glance
- Closes: 1am, Sunday 27 December 2026
- Reopens: 5am, Monday 18 January 2027
- On foot or bike: the eastern footpath stays open for pedestrians, cyclists and scooter riders; the western footpath will be closed
- Emergency vehicles: still allowed across when responding to urgent call-outs

Which bus routes change
- Routes 227, 228, 231, 232 and 236 will detour via Wellington Road and Latrobe Street, with temporary stops 350 to 400 metres from the affected Shafston Avenue stops.
- Routes 216, 221, 227, 228, 231, 232 and 236 will skirt Shafston Avenue at Connor Street, with alternative stops 250 to 500 metres away.
- Routes 227, 232 and 234 lose the Main Street stop at Story Bridge East; the nearest alternative is on Thornton Street, about 200 metres away.
- NightLink N154 will no longer serve five Main Street stops. Late-night travellers can catch the N226 instead.
- Kangaroo Point shuttle: a shuttle bus will link parts of Kangaroo Point with Woolloongabba station.
Story Bridge closure bus changes: stops that close
| Closed stop | Use instead |
| Shafston Avenue at Salstone Street | Nearby stops on Latrobe Street and Wellington Road |
| Shafston Avenue at Connor Street (two stops) | Main Street at St Vincent’s Hospital, Pearson Street or River Terrace |
| Main Street at Story Bridge East | Main Street at Thornton Street |
What it means for Valley commuters
The bridge lands right on our doorstep, so expect busier roads around Ann Street and the Bradfield Highway, and longer trips if you’re heading south of the river. Council chose the Christmas–New Year break because the network is usually quieter, though anyone working through the holidays will still feel the pinch.
Not everyone is convinced. Council’s Labor opposition leader, Jared Cassidy, argued that Council should have added extra public transport to make up for the closure. Council says the works will cost $14 million.
The good news? The eastern footpath stays open, so if you live within walking or cycling distance, crossing on foot may be quicker than any detour.
Plan ahead before you travel
The Story Bridge closure bus changes are due to appear in Translink’s Journey Planner from 30 November. Check the Translink app, visit translink.com.au or phone 13 12 30 before you head off. Drivers can use the QLDTraffic app or call 13 19 40, and you can register for Council project updates.
Will the Story Bridge closure bus changes affect your daily commute? Let us know in the comments.
You might also like: Cj Hendry’s Plush Flower Shop Comes Back to 24 Light Street for an 11-Day December Run
Source: Brisbane City Council, ABC News



